WISCONSIN PROJECT HISTORY #4
|
|
|
|
CONSTRUCTION AND INSTALLATION OF AN IN SITU SOIL & GROUNDWATER TREATMENT SYSTEM
|
|
Who: Ms. Debbie Brunette
|
|
Where: Longbranch Saloon, Wisconsin
|
|
When: October 1995 to June 1996
|
|
Size: $150K
|
|
|
|
The Remedial Action Plan/Corrective Action Design for this site called for in situ treatment of soil and ground
water contaminated with gasoline. Ground water treatment was achieved through the use of an air sparging system
with a total of twenty-two (22) sparge points.
|
|
|
|
Soil treatment was done with a vapor recovery system. EBI placed new piping across the site to connect both
systems into a portable equipment trailer. We constructed the mechanical equipment, trailer and pipe headers during
the winter. Site activities were completed after frost left the ground in May 1996.
|
|
|
|
WISCONSIN PROJECT HISTORY #10
|
|
|
|
CONSTRUCTION AND INSTALLATION OF AN IN SITU SOIL & GROUNDWATER TREATMENT SYSTEM
|
|
Who: Wisconsin DNR
|
|
Where: Dwyer Fire Site Beloit, WI
|
|
When: May 1997 through March 1998
|
|
Size: $556K
|
|
|
|
This contract called for the construction of a soil and groundwater treatment system. Ground water treatment
was achieved through the use of an air sparging system with a total of 22 sparge/extraction points.
|
|
|
|
Soil treatment was done with a vapor recovery system. EBI placed new piping across the site to connect both
systems into a pre-engineered metal building. Site activities were completed in March 1998
|
|
|
|
WISCONSIN PROJECT HISTORY #20
|
|
|
|
I-94 LONG HAUL TEL TEC, INC.
|
|
Who: Tel Tec, Inc.
|
|
Where: I-94 Eau Claire, Wisconsin
|
|
When: August 2000
|
|
Size: $35K
|
|
|
|
EBI was hired as a Subcontractor by TEL TEC, Inc. to install 6-2" HDPE fiber optic conduit along Interstate
94 by Eau Claire, Wisconsin. EBI completed almost 3,000 feet for the project. The length of bores ranged from 122'
to 583' including a stream crossing.
|
|
|
|
WISCONSIN PROJECT HISTORY #35
|
|
|
|
BURLINGTON NORTHERN DUST SUPPRESSION WATER LINE
|
|
Who: Burlington Northern Railway
|
|
Where: Superior, Wisconsin
|
|
When: February 2002
|
|
Size: $98K
|
|
|
|
EBI was contracted by Burlington Northern Railway to install an 8-inch HDPE water line at their taconite facility
in Superior, Wisconsin. A total of 3,800 feet of water line was installed by directional drilling. This was the
only practical method to install the line across wetlands as well as parallel to a taconite loading dock. Traditional
open cut methods could not have been used in these two areas.
|
|
|
|
WISCONSIN PROJECT HISTORY #54
|
|
|
|
HERTEL WATER DISTRIBUTION SYSTEM
|
|
Who: McCabe Construction
|
|
Where: Hertel, Wisconsin
|
|
When: September 2003
|
|
Size: $120,000.00
|
|
|
|
EBI was awarded a subcontract by McCabe Construction to install a new water main for the
St. Croix Tribe in Hertel, Wisconsin. EBI installed all by directional drilling 2,800 feet of 10-inch HDPE water
main. The drilling was necessary to avoid impacts to wetlands and roadways.
|
|
|
|
WISCONSIN PROJECT HISTORY #57
|
|
|
|
ROCK RIVER WATER MAIN CROSSING
|
|
Who: GMS Excavators
|
|
Where: Fort Atkinson, Wisconsin
|
|
When: October 2003
|
|
Size: $44,000.00
|
|
|
|
EBI was awarded a subcontract from GMS Excavators to install a new water main across the
rock River in Ft. Atkinson, Wisconsin. EBI installed all by direction drilling 490 feet of 18-inch HDPE water main.
The drilling was the only option to cross the river.
|
|
|
|
WISCONSIN PROJECT HISTORY #60
|
|
|
|
TOMORROW RIVER CROSSING
|
|
Who: Jossart Brothers
|
|
Where: Amherst, Wisconsin
|
|
When: December 2003
|
|
Size: $58,000.00
|
|
|
|
EBI was awarded a subcontract from Jossart Brothers to install a new water main along
US Highway 10 and across Tomorrow River in Amherst, Wisconsin. EBI installed all by directional drilling 1,400
feet of 10-inch HDPE water main. The drilling was the only option to cross the river and to reduce the project
cost by eliminating expensive restoration along US Highway 10.
|
|
|
|
WISCONSIN PROJECT HISTORY #63
|
|
|
|
EAST GATEWAY PUBLIC UTILITIES
|
|
Who: Van Staten Construction
|
|
Where: Waupaca, Wisconsin
|
|
When: February 2004
|
|
Size: $100,000.00
|
|
|
|
EBI was awarded a subcontract from Van Straten Construction to conduct two 2,000 foot crossings of the Waupaca
river and adjoining wetlands just East of Waupaca, Wisconsin. EBI successfully installed the 8-inch HDPE force
main and the 12-inch HDPE water main without complications and in two weeks.
|
|
|
|
WISCONSIN PROJECT HISTORY #81
|
|
|
|
2004 UTILITY IMPROVEMENTS
|
|
Who: S. J. Louis Construction
|
|
Where: Rice Lake, Wisconsin
|
|
When: December 2004
|
|
Size: $18,500.00
|
|
|
|
EBI was awarded a subcontract from S. J. Louis Construction for the installation by directional drilling of
a 16-inch HDPE water main and a 6-inch HDPE duct as part of the 2004 Utility Improvements Project in Rice Lake,
Wisconsin. The total amount of pipe installed was 600 feet. EBI completed the project in 2 days.
|
|
|
|
WISCONSIN PROJECT HISTORY #82
|
|
|
|
WOLF RIVER & RASMUSSEN CANAL CROSSINGS
|
|
Who: City of New London
|
|
Where: New London, Wisconsin
|
|
When: December 2004
|
|
Size: $40,000.00
|
|
|
|
EBI was awarded a contract from the City of New London for the installation by directional drilling of a 12-inch
HDPE water main as part of the Wolf River and Rasmussen Canal Crossings Project in New London, Wisconsin. The toal
amount of pipe installed across the two water bodies was 530 feet. EBI completed the project in three days.
|
|
|
|
WISCONSIN PROJECT HISTORY #87
|
|
|
|
K-TOWN/DRY TOWN INTERTIE WATER MAIN
|
|
Who: LCO Development Corp.
|
|
Where: Hayward, Wisconsin
|
|
When: July 2005
|
|
Size: $60,000.00
|
|
|
|
EBI was awarded a subcontract from LCO Development Co. for the installation by directional drilling of a 12-inch
HDPE water main as part of the K-Town/Dry Town Intertie Water Main on the Lac Courte Oreille Indian Reservation
in Hayward, Wisconsin. The work consisted on installing 1,700 feet of 12-inch HDPE. The highlight of the project
was the installation on one 1,100' shot across a wetland. the work was completed in four days.
|
|
|
|
WISCONSIN PROJECT HISTORY #93
|
|
|
|
EAST SIE UTILITY
|
|
Who: A-1 Excavating
|
|
Where: Cumberland, Wisconsin
|
|
When: June 2005
|
|
Size: $113,000.00
|
|
|
|
EBI was awarded a subcontract from A-1 Excavating for the installation by directional drilling of a 12-inch
HDPE water main, and 8-inch HDPE water main and a 4-inch HDPE force main as part of the East Side Utility Project
in Cumberland, Wisconins. The highlights of the project was the installation of 1,400 feet of both the 12-inch
HDPE water main and the 4-inch HDPE force main across Beaver Dam Lake each in one shot.
|
|
|
|
WISCONSIN PROJECT HISTORY #95
|
|
|
|
WASTE WATER COLLECTION SYSTEM
|
|
Who: McCabe Construction
|
|
Where: Hertel, Wisconsin
|
|
When: August 2005
|
|
Size: $55,000.00
|
|
|
|
EBI was awarded a subcontract from McCabe Construction for the installation by directional drilling of an 8-inch
HDPE sanitary sewer and a 4-inch HDPE force main as part of the Water Water Collection System Project in Hertel,
Wisconsin. A total of 3,300 feet of HDPE pipe was installed for the project.
|
|
|
|
WISCONSIN PROJECT HISTORY #97
|
|
|
|
PATTISON PARK SEWER RECONSTRUCTION
|
|
Who: A-1 Excavating
|
|
Where: Superior, Wisconsin/Douglas County
|
|
When: October 2005
|
|
Size: $30,000.00
|
|
|
|
EBI was awarded a subcontract from A-1 Excavating for the installation by directional drilling of a 4-inch HDPE
force main as part of the Pattison Park Sewer Reconstruction Project in Superior, Wisconsin/Douglas County. A total
of 2,400 feet of HDPE pipe was installed for the project. The installation was completed in two shots with the
longest being 1,600 feet.
|
|
|
|
WISCONSIN PROJECT HISTORY #101
|
|
|
|
SCENIC ESTATES
|
|
Who: New London Utilities
|
|
Where: New London, Wisconsin
|
|
When: November 2005
|
|
Size: $40,000.00
|
|
|
|
EBI was awarded a contract from New London Utilities for the installation by directional drilling of a 12-inch
HDPE water main as part of the Wolf River Crossing Project in New London, Wisconsin. The proiject had two crossings
of the Wolf River totaling 800 feet. The installation was completed in two days.
|
|
|
|
WISCONSIN PROJECT HISTORY #113
|
|
|
|
WATER & WASTEWATER IMPROVEMENTS
|
|
Who: A-1 Excavating
|
|
Where: Antigo, Wisconsin
|
|
When: October 2006
|
|
Size: $50,000.00
|
|
|
|
EBI was awarded a subcontract from A-1 Excavating for the installation, by directional drilling, of a 12-inch
DIPS HDPE water main for the Water and Wastewater Improvements Project in Antigo, Wisconsin. A total of 1,140 feet
of 12-inch water main was installed in three shots that went across Spring Brook twice and a County Highway. The
bores were completed in three working days.
|
|
|
|
WISCONSIN PROJECT HISTORY #104
|
|
|
|
TIF PHASE 1 SANITARY SEWER/WATER MAIN EXTENSION
|
|
Who: PTS Contractors
|
|
Where: Suamico, Wisconsin
|
|
When: January 2006
|
|
Size: $150,000.00
|
|
|
|
EBI was awarded a subcontract from PTS Contractors for the installation by directional drilling of various sizes
of HDPE sanitary sewer, force main and water main as part of the TIF Phase 1 Sanitary/Water Main Extension Project
in Suamico, Wisconsin. A total of 960' of 12" sanitary sewer, 700' of 10" sanitary sewer 1,350' of 10"
force main and 1,350' of 14" water main was installed in approximately 3 weeks during January 2006.
|
|
|
|
WISCONSIN PROJECT HISTORY #125
|
|
|
|
Who: A-1 EXCAVATING
|
|
Where: Madford, Wisconsin
|
|
When: May 2007
|
|
Size: $122,000.00
|
|
|
|
EBI was awarded a subcontract from A-1 Excavating for the installation, by directional drilling, of a 12-inch
HDPE DIPS water main and a 12-inch HDPE DIPS sanitary sewer for a new WalMart Supercenter in Medford, Wisconsin.
The 12-inch water main totaled 1,300 feet long and the sanitary sewer total 1,950 feet and was installed at a
grade of 0.5 percent.
|
|
|
|
WISCONSIN PROJECT HISTORY #126
|
|
|
|
Who: A-1 EXCAVATING
|
|
Where: Hixton, Wisconsin
|
|
When: June 2007
|
|
Size: $45,000.00
|
|
|
|
EBI was awarded a subcontract from A-1 Excavating for the installation, by directional drilling, of a 12-inch
HDPE IPS water main and a 6-inch HDPE DIPS force main sewer for the 2007 Street and utility Improvements in Hixton,
Wisconsin. Both the mains were completed in one shot at 1,150 feet each and went under I-90 and the associated
access ramps.
|
|
|
|
US 2 UTILITY IMPROVEMENTS PHASE 1 #133
|
|
|
|
Who: RJS CONSTRUCTION GROUP
|
|
Where: Ashland, Wisconsin
|
|
When: September, 2007
|
|
Size: $114,000.00
|
|
|
|
EBI was awarded a subcontract from RJS Construction Group for the installation, by directional drilling of a
8-inch HDPE DIPS water main for the US Highway 1 Utility Improvements Phase 1 Project in Ashland, Wisconsin. A
total of 6,177 feet of water main was installed along Highway 2 and a connecting city street.
|
|
|
|
WESTON POWER PLANT DUST SUPPRESSION LINE #135
|
|
|
|
Who: JAMES PETERSON & SONS
|
|
Where: Wausau, Wisconsin
|
|
When: September, 2007
|
|
Size: $110,000.00
|
|
|
|
EBI was awarded a subcontract from James Peterson & Sons for the installation, by directional drilling,
of a 10-inch HDPE IPS water main and 4-inch HDPE IPS water main for a dust suppression line at the Weston Power
Plant in Wausau, Wisconsin. To reduce surface impacts as well as to minimize disruptions in the power plant yard
both the 10-inch and the 4-inch were pulled in together. A total of 3,130' of each line size was installed.
|
|
|
|
|
|
|
|
|