NO DAKOTA - PROJECT HISTORY #8
|
|
|
|
METHANE GAS CAPTURE/DISTRIBUTION SYSTEM
|
|
Who: RDO Foods
|
|
Where: Grand Forks, North Dakota
|
|
When: Fall 1998
|
|
Size: $150K
|
|
|
|
EBI was awarded a contract for the construction of a methane gas capture/distribution system at a food processing
plant in Grand Forks, North Dakota. EBI installed approximately 1,000 feet of four inch polyethylene pipe and two
condensate legs to recover methane gas from a food waste lagoon and connected it to a boiler in the plant for heating
purposes.
|
|
|
|
This system was designed to reduce the plant's heating costs by more than 10%.
|
|
|
|
NO DAKOTA - PROJECT HISTORY #37
|
|
|
|
VALLEY CITY FORCE MAIN REPLACEMENT
|
|
Who: Northern Excavating
|
|
Where: Valley City, North Dakota
|
|
When: May - June 2002
|
|
Size: $240K
|
|
|
|
EBI was hired as a subcontractor by Northern Excavating to install by directional drilling, 6,000 feet of 18-inch
HDPE force main for the city of Valley City, North Dakota. The route of the force main went beneath the Sheyenne
River twice and under Interstate 94. Additionally the force main had to be installed up a very steep hillside (up
to 34%). To limit the impact on the city golf course, tennis courts and sports complex, directional drilling was
chosen as the preferred method. EBI completed the installation of 6,000 feet in six weeks.
|
|
|
|
NO DAKOTA - PROJECT HISTORY #58
|
|
|
|
BARNES COUNTY RURAL WATER IMPROVEMENTS
|
|
Who: Swanberg Construction
|
|
Where: Eckelson, North Dakota
|
|
When: November 2003
|
|
Size: $48,000.00
|
|
|
|
EBI was awarded a subcontract from Swanberg Construction to install a new water main across
the Fox Lake berm by Eckelson, North Dakota. EBI installed all by directional drilling 1,430 feet of 14-inch HDPE
water main. The drilling was the only option to cross the berm which required one continuous bore of 1,050 feet.
|
|
|
|
NO DAKOTA - PROJECT HISTORY #59
|
|
|
|
JAMESTOWN LIFT STATION REPLACEMENT
|
|
Who: Quam Construction
|
|
Where: Jamestown, North Dakota
|
|
When: November 2003
|
|
Size: $28,000.00
|
|
|
|
EBI was awarded a subcontract from Quam Construction to install a new force main and gravity sewer main as part
of a sewer improvement project in Jamestown, North Dakota. EBI installed by directional drilling 635 feet of 10-inch
HDPE force main and 250 feet of 12-inch HDPE gravity main. The drilling was the only option to cross the James
River and to eliminate expensive site restoration.
|
|
|
|
NO DAKOTA - PROJECT HISTORY #121
|
|
|
|
JAMESTOWN - RAW WATER LINE
|
|
Who: Swanberg Construction
|
|
Where: Jamestown, North Dakota
|
|
When: December, 2006
|
|
Size: $118,600.00
|
|
|
|
EBI was awarded a subcontract from Swanberg Construction for the installation, by directional drilling, of a
24-inch IPS HDPE water, a 16-inch IPS HDPE water main and a 14-inch IPS HDPE water main as part of the Raw Water
Main Project Jamestown, North Dakota. The 24-inch water main was 400 feet long and went across the James River.
The 16-inch line was 500 feet long and went across a newly paved street and parking lot. The 14-inch line was 900
feet and went across a ball field. The work was completed in five working days.
|
|
|
|
NO DAKOTA - PROJECT HISTORY #129
|
|
|
|
POTABLE WATER TRANSMISSION MAIN
|
|
Who: Robert Gibbs & Sons
|
|
Where: Minot, North Dakota
|
|
When: August, 2007
|
|
Size: $103,000.00
|
|
|
|
EBI was awarded a subcontract from Robert Gibb & Sons for the installation, by directional drilling, of
a 16-inch Fusible PVC water main in Minot, North Dakota. The 16-inch water main was one shot, approximately 900
feet long and installed in two days.
|
|
|
|
NO DAKOTA - PROJECT HISTORY #138
|
|
|
|
ROLLING HILLS WATER MAIN
|
|
Who: Orlander Contracting
|
|
Where: Fort Totten, North Dakota
|
|
When: November, 2007
|
|
Size: $103,000.00
|
|
|
|
EBI was awarded a subcontract from Orlander Contracting for the installation, by directional drilling, of a
14-inch HDPE DIPS water main as part of water distribution sytem south of Devils Lke, North Dakota. EBI completed
the installation of 3,440 feet of pipe in three shots. Directional drilling was chosen to eliminate impacts to
wetlands.
|
|
|