EBI DRILLING INC

LOUISIANA - PROJECT HISTORY #1


CONSTRUCTION OF FUELING SYSTEM

Who: U. S. Government

Where: Barksdale AFB Shreveport, Louisiana

When: April, 1996 to September 1996

Size: $1.2 million

 

EBI was awarded contract NO. N62467-95-C-0796 for the construction of a new fueling system at Barksdale AFB. The system is for fueling government vehicles and B-52 Bomber support vehicles. The project consisted of installing six double wall, FRP UST with a total of 100,000 gallons of capacity of four (4) products (gasoline, diesel, JP-8, De-icer). New double wall FRP piping was installed to a total of ten (10) dispensers for four (4) bulk handling pumps. More than two miles of underground piping were placed ranging in size from 2" to 6". The new bulk product handling rack had operating rates of 325 gpm. Mechanical requirements included Gorman Rupp centrifugal pumps, Liquid Control flow meter, OCV electric solenoid and truck loading two state control valves, and vapor recovery systems. The entire system was monitored for high level/low level product and water infiltration into interstices and sumps. Scheduled interruptions were limited to a total of seven days. The government required an extensive quality control program by the Contractor to reduce rework items and omissions.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EBI Drilling Inc., 5910 Fremont Street., Duluth, MN. 55807

 

 

Phone (218) 628-0454, Fax (218) 628-0455, WWW.EBIMN.COM

 

 

 

 

Copyright 2005-6-7-8, EBI Drilling Inc., All rights reserved